Analisis perhitungan isi awal minyak di tempat pada lapangan RHR menggunakan metode balance dan software mbal


Oleh : Rinanda Hanindyo Rastiarsa

Info Katalog

Nomor Panggil : 945/TP/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Onnie Ridaliani

Pembimbing 2 : Djunaedi Agus Wibowo

Subyek : Reservoir - Analysis;Oil technical - Research

Kata Kunci : MBAL Software and Material Balance

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TM_071001300175_Halaman-Judul.pdf
2. 2018_TA_TM_071001300175_Bab-1.pdf
3. 2018_TA_TM_071001300175_Bab-2.pdf
4. 2018_TA_TM_071001300175_Bab-3.pdf
5. 2018_TA_TM_071001300175_Bab-4.pdf
6. 2018_TA_TM_071001300175_Bab-5.pdf
7. 2018_TA_TM_071001300175_Daftar-pustaka.pdf
8. 2018_TA_TM_071001300175_Lampiran.pdf

L Lapangan RHR berlokasi di Cekungan Kutai, Kalimantan Timur.Lapangan RHR ini mempunyai 2 reservoir, yaitu reservoir HR dan reservoir RN.Reservoir HR telah dikembangkan sejak 30 Juni 1975 sedangkan reservoir RNpada 31 Mei 1988. Penentuan jenis tenaga dorong atau Drive Mechanism padakedua reservoir ini dengan menggunakan tiga metode yakni metode kualitatif,Drive Index, dan Ganesh Thakur. Isi minyak awal ditempat Lapangan RHR akandihitung menggunakan Software MBAL dan metode Material Balance. LapanganRHR memiliki jenis tenaga dorong berupa Combination Drive karena pada hasilanalisa jenis tenaga dorong kualitatif nilai Gas Oil Ratio yang naik lalu kemudianturun, pada analisa Drive Index nilai SDI yang lebih dominan, dan pada analisaGanesh Thakur memiliki skema grafik yang setelah dianalisa memilikikarakteristik Water Drive dan Solution Gas Drive. Perhitungan nilai isi awalminyak di tempat reservoir HR dengan menggunakan Software MBAL didapatkannilai sebesar 8.003 MMSTB dan isi awal minya di tempat dengan metodematerial balance sebesar 8.139 MMSTB. Sedangkan perhitungan nilai isi awalminyak di tempat reservoir RN dengan menggunakan Software MBAL didapatkannilai sebesar 6.220 MMSTB dan isi awal minyak di tempat dengan metodematerial balance sebesar 6.117 MMSTB.

O On RHR Field located in Kutai basin, East Kalimantan. RHR Field has 2reservoir, HR Reservoir and RN Reservoir. HR Reservoir has been developedsince 30th June 1975 and RN Reservoir since 31st May 1988. Drive mechanismdetermination in RHR Field using three methods which are Qualitative method,Drive Index method, and Ganesh Thakur Method. Original Oil in Place will becalculated by MBAL Software and Material Balance. Both Reservoir has SolutionGas Drive drive mechanism because on qualitative drive mechanism analysis theGas – Oil Ratio value go up and then down, on Drive Index analysis SDI valuemore dominant, and in Ganesh Thakur analysis has similar graphic scheme toSolution Gas Drive and Water Drive. Calculation of the value of Original Oil InPlace of HR Reservoir calculated by using MBAL Software is 8.003 MMSTB andcalculated by material balance method is 8.139 MMSTB. Calculated the value ofOriginal Oil In Place by using MBAL software RN Reservoir is 6.220 MMSTB andcalculated by material balance method is 6.117 MMSTB.