DETAIL KOLEKSI

Analisis tingkat getaran tanah dan suara akibat peledakan di PT. Agincourt Resource Sumatera Utara

2.5


Oleh : I Gusti Bagus Wisnu Utama

Info Katalog

Nomor Panggil : 535/TT/2018

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2018

Pembimbing 1 : Pantjanita Novi Hartami

Pembimbing 2 : Taat Tri Purwiyono

Subyek : Mining - Gold;Peak particle velocity

Kata Kunci : ground vibration, scaled distance, blastware, power regresion

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2018_TA_TB_073001400050_Halaman-Judul.pdf
2. 2018_TA_TB_073001400050_BAB-I.pdf
3. 2018_TA_TB_073001400050_BAB-II.pdf
4. 2018_TA_TB_073001400050_BAB-III.pdf
5. 2018_TA_TB_073001400050_BAB-IV.pdf
6. 2018_TA_TB_073001400050_BAB-V.pdf
7. 2018_TA_TB_073001400050_Daftar-Pustaka.pdf
8. 2018_TA_TB_073001400050_Lampiran.pdf

T Tambang emas PT. Agincourt Resources (PT. AR) Sumatera Utara, TapanuliSelatan memiliki 2 pit yang sedang produksi yaitu pit Purnama & pit Barani. Dalamproses produksinya dibutuhkan peledakan untuk memberai massa batuan agarbatuan dapat digali dan dimuat untuk diolah atau batuan waste dibuang ke disposal.Proses peledakan menghasilkan energi yang digunakan untuk memberai masabatuan tetapi hasil peledakan tersebut menghasilkan energi sisa juga. Getaranpeledakan merupakan salah satu energi sisa hasil dari peledakan. Oleh karena itudilakukan pengukuran getaran tanah dengan alat Blastmate III untuk mengetahuipersamaan untuk menentukan getaran yaitu Peak Particle Velocity (PPV) untuktambang PT. AR. Pada pit Purnama terdapat processing plant yang digunakansebagai tempat peleburan dan pemurnian berjarak sekitar ±50 m. Pada pit Baraniterdapat perumahan warga terdekat yang berjarak sekitar ± 1200m. Hal ini yangmenjadi dasar pengukuran untuk membuat prediksi dan getaran di kelompokkanpengukurannya di depan freeface dan di belakang freeface. Analisis getaranmenggunakan rumus scaled distance yaitu perbandingan jarak dengan akar pangkatsetengah dari jumlah bahan peledak. Hasil regresi power untuk dibelakang freefacemenghasilkan sedangkan untuk di depan freefacesebesar . Untuk nilai suara hasil peledakan didapatkanpersamaan sebagai berikut

P PT. Agincourt Resources (PT. AR) Gold Mine located in North Sumatra, SouthTapanuli has 2 pits that currently in production, namely Purnama pit & Barani pit.In the mining production process, blasting is needed to provide crushed rock masscause of the explotion so that rocks rich in mineral can be excavated and loaded to beprocessed or the waste rock is discharged to disposal. The blasting process producesenergy that is used to provide rock mass but the blasting results produce residualenergy as well. Blasting vibration is one of the residual energy results from blasting.Therefore, measurements of ground vibration with the Blastmate III device are usedto determine the equation for determining the vibration, namely peak particlevelocity (PPV) for the PT. AR gold mine. Loacted near from Purnama pit there is aprocessing plant that is used as a smelting and refining the distance is within ± 50 mfrom the Purnama pit. In the Barani pit the nearest residential area which is about ±1200m. This is the basis of measurement to make predictions of the groundvibrations grouped in front of the freeface and behind the freeface. Vibrationanalysis uses a scaled distance formula which is the ratio of distance to the root ofthe half of the amount of explosives. The result from the power regresion formeasurement behind the freeface produce the equationwhile the measurement from in front of the freeface produce the equation of. For the sound preasure level the regretion alnalysisproduce .

Bagaimana Anda menilai Koleksi ini ?