DETAIL KOLEKSI

Usulan model pemilihan supplier pada energi mega persada (EMP) malacca strait menggunakan metode promethee


Oleh : Rendy Muji Rahmat

Info Katalog

Penerbit : FTI - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2011

Pembimbing 1 : Triwulandari

Subyek : Petroleum industry;Production – Process;Oil well drilling

Kata Kunci : supplier, energi mega persada (EMP), malacca strait, promethee

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2011_TA_TI_06304209_1_Halaman-Judul.pdf
2. 2011_TA_TI_06304209_2_Bab-1.pdf
3. 2011_TA_TI_06304209_3_Bab-2.pdf
4. 2011_TA_TI_06304209_4_Bab-3.pdf
5. 2011_TA_TI_06304209_5_Bab-4.pdf
6. 2011_TA_TI_06304209_6_Bab-5.pdf
7. 2011_TA_TI_06304209_7_Bab-6.pdf
8. 2011_TA_TI_06304209_8_Daftar-Pustaka.pdf
9. 2011_TA_TI_06304209_9_Lampiran.pdf

B Berdasarkan pada kerangka regulasi industri minyak bumi dan gas di Indonesia, industri perminyakan dibagi kedalam 2 jenis industri, yaitu Industri Up Stream (Industri lulu) dan Industri Down Stream (Industri Hilir). Energi Mega Persada (EMP) Malacca Strait rerusahaan yang bergerak pada pengelolaan kegiatan usaha hulu minyak dan gas bumi di vilayah Republik Indonesia. Salah satu kegiatan dalam melakukan pengeboran minyak ini. adalah pengadaan peralatan pengeboran. Pemasok peralatan pengeboran ini pun sangatlah ,anyak, baik dari dalam maupun luar negeri dengan kualitas, harga, kecepatan pengiriman, fitur - fitur lainnya yang berbeda pula. Pemilihan perusahaan supplier menjadi salah satu ,bagian yang penting dari bagian pengadaan (procurement) di sebuah perusahaan perminyakan. Pokok pembahasan pada penelitian tugas akhir ini adalah membuat usulan model pemilihan supplier pada EMP Mallaca Strait den melakukan penilaian pada tiap-tiap kriteria yang telah ditetapkan dan menentukan uru (prioritas) pemilihan supplier/rekanan fendor yang potensial dalam analisis multikriteria yang ada dengan Metode Promethee. Hasil analisa yang didapatkan, yaitu dikarenakan produk yang akan dipesan oleh EMP Mallaca Strait berjumlah 11 jenis maka dilakukan perhitungan untuk memilih barang dengan nilai pembelian terbesar dengan menggunakan ABC, yang menghasilkan komponen FAN, IMPELLER, Size & Tipe BC6-570 (impeller pompa) dengan fungsi mengubah energi mekanik yaitu putaran impeller menjadi energi fluida (zat cair) berada pada kelas A. Kriteria-kriteria yang digunakan adalah Kualitas barang (K1) menggunakan referensi IV, Harga barang (K2) dengan preferensi III, Solvabilitas dan Kredibilitas Supplier K3) dengan preferensi IV, Customer Care (K4) dengan preferensi IV, dan SHE/Safety, [ealth, & Environment (K5) dengan preferensi IV. Dari perhitungan Metode PROMETHEE iatas, maka didapatkanlah hasil urutan prioritas pemilihan supplier, yaitu PT. 13 (S2) = 0.2276563 arada di urutan pertama, PT. D (S4) = 0.0092969 urutan kedua, PT. C (53) = 0.0046094 urutan Dtiga, PT. A (S1) = -0.113359 urutan keempat, dan PT. E (55) = -0.128203 urutan kelima.

B Based on the regulatory framework of the petroleum and gas industry in Indonesia, the petroleum industry is divided into two types of industries, namely Up Stream Industry (Industry lulu) and Down Stream Industry (Downstream Industry). Energi Mega Persada (EMP) Malacca Strait is a company engaged in the management of upstream oil and gas activities in the territory of the Republic of Indonesia. One of the activities in doing this oil drilling. is the procurement of drilling equipment. Supplier of this drilling equipment is very much, anyak, both from home and abroad with quality, price, delivery speed, other features are different too. The selection of supplier companies becomes one of the most important parts of the procurement section of a petroleum company. The main topic of this final research is to make proposal of supplier selection model at EMP Mallaca Strait by doing assessment on each predetermined criteria and determining uru (priority) of potential supplier / supplier fendor selection in multicriteria analysis with Promethee method. The result of analysis obtained, that is because the product to be ordered by EMP Mallaca Strait amounts to 11 types then calculation is done to choose the goods with biggest purchase value by using ABC, which produce component FAN, IMPELLER, Size & Type BC6-570 (impeller pump) with the function of changing the mechanical energy that is the rotation of the impeller into fluid energy (liquid) is in class A. The criteria used are Quality of goods (K1) using reference IV, Price of goods (K2) with preference III, Solvency and Kredibility of K3 Supplier) with preferences IV, Customer Care (K4) with preference IV, and SHE / Safety, [ealth, & Environment (K5) with preference IV. From the calculation of PROMETHEE iatas method, then get the result of priority order of supplier selection, that is PT. 13 (S2) = 0.2276563 arada in the first place, PT. D (S4) = 0.0092969 second order, PT. C (53) = 0.0046094 order Dtiga, PT. A (S1) = -0.113359 fourth order, and PT. E (55) = -0.128203 fifth order.

Bagaimana Anda menilai Koleksi ini ?