DETAIL KOLEKSI

Rencana alternatif sarana plambing pada hotel Manhanttan Kuningan Jakarta

0.0


Oleh : Gilang Cempaka

Info Katalog

Nomor Panggil : TATL.05588

Penerbit : FALTL - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2005

Pembimbing 1 : Amir Susanto P

Pembimbing 2 : Rositayanti Hadisoebroto

Subyek : Plumbing

Kata Kunci : Hotel Manhattan, plumbing facilities

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2005_TA_STL_08200030_Halaman-Judul.pdf
2. 2005_TA_STL_08200030_Bab-1.pdf
3. 2005_TA_STL_08200030_Bab-2.pdf
4. 2005_TA_STL_08200030_Bab-3.pdf
5. 2005_TA_STL_08200030_Bab-4.pdf
6. 2005_TA_STL_08200030_Bab-5.pdf
7. 2005_TA_STL_08200030_Bab-6.pdf
8. 2005_TA_STL_08200030_Daftar-Pustaka.pdf
9. 2005_TA_STL_08200030_Lampiran.pdf

H Hotel manhattan ini terletak di jalan Prof.Dr. Satrio, Setiabudi jakarta Selatan dengan luas lahan 5000 m persegi dan tinggi bangunan 132 m. Hotel ini terdiri atas 29 lantai dengan 238 kamar dan 3 lantai basement yang digunakan sebagai tempat parkir mobil dan ruang mekanikal elektrikal. Sumber air berasal dari PDAM dan cadangan sumur dalam yang masing-masing sebesar 206 m kubic/hari dan 122,77 m kubik/hari. berdasarkan hasil perhitungan dengan standar SNI 03-6481-2000 maka , hotel ini mempunyai tangki bawah dengan kapasitas air bersih sebesar 328,77 m kubik. Air dari tangki bawah dialirkan ke tangki atap mempergunakan pompa dengan kapasitas 69,25 m kubik. Kapasitas tangki atap sebesar 34,63 m kubik sebanyak dua unit. dari tangki atap air akan dialirkan secara gravitasi ke setiap lantai. Untuk lantai 27,28 dan 29 air akan dialirkan dengan bantuan hidrofor. Pada sistem perpipaan air buangan diterapkan sistem terpisah antara, air kotoran, air kotor dan air buangan dapur. Kemudian air buangan tersebut, akan langsung disalurkan ke saluran pembuangan air limbah. Adapun air kotoran yang berasal dari alat plambing pada lantai basement akan ditampung terlebih dahulu yang kemudian dipompakan menuju saluran pembuangan air limbah. Sistem ven terdiri dari ven pipa tegak, ven cabang, loop dan yoke vent. Yoke vent dipasang pada setiap 5 lantai dengan tujuan meratakan tekanan. Pipa air bersih menggunakan jenis Polyvinylchloride (PVC) kelas VP dengan diameter pipa dinas PDAM adalah 50 mm dan diameter. Air dialirkan menuju tangki bawah dan di pompakan menuju tangki atap dengan diameter 65 mm. Dan diameter pipa tegak distribusi dari tangki atap sebesar 200 mm. Pemasangan PRV dilaksanakan pada lantai II dan lantai 22. Untuk pipa air buangan menggunakan jenis pipa Cast Iron Pipe (CIP) dengan diameter pipa tegak air buangan sebesar 200 mm diameter pipa tegak ven sebesar 100 mm. penyaluran air hujan pada atap lantai 5 dengan luas 780 m persegi dan lantai 30 dengan luas 812 m persegi akan disalurkan ke talang datar selanjutnya ke 10 buah pipa tegak dengan diameter 100 mm ke saluran terbuka yang akan disalurkan ke dalam saluran kota. berdasarkan hasil perhitungan diameter tersebut dapat mewakili curah hujan maksimum sebesar 200 mm.jam dan penyaluran air hujan yang masuk ke saluran kota mempunyai debit air hujan sebesar 82 liter/detik. Penanggulangan kebakaran dengan sistem hidran dipasang pada setiap lantai. Berdasarkan hasil perhitungan maka kapasitas air cadangan pemadam kebakaran selama 45 menit sebesar 146,25 m kubik yang dapat bekerja secara simultan setiap 5 lantai.

M Manhattan hotel is located on Jalan Prof.DR. Satrio, Setiabudi, South Jakarta, wiyh 5.000 m persegi, and the high building 132 m. This hotel consists of 29 floors with 238 bed rooms. and 3 basements floor used as parking lot, and mechanical electrical rooms. The water sources is derived from PDAM (Regional Water Supply Company), and reserve of deepwel which respectively has a capacity of 206 m cubic/day, and 122.77 m cubic/day. Based on calculation result by means of SNI Standard 03-6481-2000, therefore this hotel has a lower (ground) tank with a clean capacity of 328.77 m cubic. The water from ground tank will be transfer to the roof tank by using pump with at the rate of flow 69.25 m cubic/day. There are two roof tanks a respective each capacity of 34.63 m cubic. The water from roof tank will be distribute to any point in each floors. For the 27, 28 and 29 floor the water will be flowed by using hidropneumatic system. A separate system will be applied in wastewater piping system between soil water, used water and kitchen wastewater . later the soil wastewater will be channeled directly to the wastewater drainage. The soil water originating from plumbing equipment on the basement floor will first received in a sumpit, then it will be pumped through a wastewater disposal. Then ven system consist of stack vent, brsnch vent, loop vent, and yoke vent. Yoke vent are installed in every five floors with the purpose of equqlizing the pressure. Polyvinylchloride (PVC) class VP are used for distribute clean water. The water flow to ground tank and after that, it will be pump to the roof tank with 65 mm diameter. And the distribution pipe from the roof tank using 200 mm diameter. Pressure reducing Valve (PRV) are installed in apipe shaft at floor II and floor 22. cast iron Pipe (CIP) are used for wastewater piping with 200 mm diameter and the vent stack with the diameter of 100 mm. The rain water from the roof of 5 floor with total area 780 m persegi and 30 floor with total area 812 m persegi will flow through roof gutter to the ten drainage pipe stack with 100 mm diameter to the drain open channel and will be channeled in city drainage. Based on the calculation result, such diameter can flow the water proportional to the maximum waterfall that is 200 mm/hour. And the rain water disposal going to the city drainage has a rain water at the rate of flow 82 liter/second. The fire protection with hydrant box is installed on each floor. Based on the calculation result in the hydran system good operate around 45 minute with storage 146.25 m cubic which can work simultancously for every 5 floors.

Bagaimana Anda menilai Koleksi ini ?