DETAIL KOLEKSI

Estimasi tonase dan kadar emas, perak, pada level 1061 Cibitung PT Cibaliung Sumberdaya, Pandeglang Banten

5.0


Oleh : Sarifatuningsih

Info Katalog

Nomor Panggil : 222/TP/2013

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2013

Pembimbing 1 : Chairul Nas

Subyek : Gold mines - natural resources;Silver - natural resources;Precious metals;Geology

Kata Kunci : cikoneng, gold and silver, deposits, grade average and tonnage, geologic model, cibaliung undergorun

Status Posting : Published

Status : Lengkap


File Repositori
No. Nama File Hal. Link
1. 2013_TA_TB_07309035_9.pdf
2. 2013_TA_TB_07309035_8.pdf
3. 2013_TA_TB_07309035_7.pdf
4. 2013_TA_TB_07309035_6.pdf
5. 2013_TA_TB_07309035_2.pdf
6. 2013_TA_TB_07309035_1.pdf
7. 2013_TA_TB_07309035_5.pdf
8. 2013_TA_TB_07309035_4.pdf
9. 2013_TA_TB_07309035_3.pdf

T Tonase dan kadar emas dan perak dari Cebakan Bijih pada Level 1061 Tambang Emas Bawah Tanah Cibaliung PT Cibaliung Sumberdaya (CSD) diestimasi. Bijih yang berbentuk urat tersebut memanjang dari utara ke selatan, dari Cikoneng (CKN) ke Cibitung (CBT). Metode estimasi yang digunakan adalah metode Inverse Distance, penaksiran menggunakan software AutoCAD dengan Autolips yang akan menghasilkan model geologi dalam bentuk plan view 2 dimensi. Dari model tersebut di dapat persebaran kadar Au dan Ag dan luas daerah. Sehingga dapat di hitung kadar rata-rata dan tonasenya. Kadar Au rata-rata level 1061 Cibitung untuk kadar berwarna biru 2,7 gpt, untuk kadar rata-rata berwarna kuning 3,9 gpt, untuk kadar rata-rata berwarna merah 11,2 gpt sedangkan untuk kadar Ag rata-rata berwarna merah 21,03 gpt, untuk kadar rata-rata berwarna cyan 37,66 gpt, untuk kadar ratarata berwarna magenta 66,95 gpt. Estimasi tonase level 1061 Cibitung dengan luas daerah 542 m² adalah 1.420,04 ton.

T The tonnage and grade og gold and silver in ore deposits at level 1061 Cibaliung underground gold mine PT Cibaliung Sumberdaya (CSD) is estimation. The ore in form of veins extends from north to south, or from the Cikoneng (CKN) to Cibitung (CBT). Estimation method used is a method of calculating the Inverse Distance, using AutoCAD software with Autolips that will result in geological models form of 2-dimensional plan view. From the geologic model generated grade of Au, Ag and area. So we can calculating the grade average and tonnage. Average grade of Au on level 1061 Cibitung for the rate of 2.7 gpt in blue colour, the average of 3.9 gpt in yellow colour , for the average of 3.9 gpt in red colour. Average grade of Ag for the rate of 21,03 gpt in red colour, for the average 37.66 gpt in cyan colour, for the average of 66.95 gpt magenta colour. Estimated tonnage on level 1061 Cibitung area with an area of 542 m² is 1,420,04 ton.

Bagaimana Anda menilai Koleksi ini ?